Building
Burrows Road, Sydney June 2019 – October 2019

WestConnex M05
Complex Building Structure

FRP works for the Motorway Control Centre, for Degnan Constructions
Project Overview

The FRP package for WestConnex's Motorway Control Centre.

To ensure the safety of the community, workers and road users, WestConnex designed a central Motorway Control Centre (MCC) where motorways are monitored and managed 24 hours a day. The MCC would be the central building for all communications and control of the project's operational management control systems, and was constructed within the Burrows Road motorway operations complex.

DAMCON was the preferred subcontractor to carry out the FRP works for the new multi-million-dollar centre. The project involved the construction of 3,000 square metres of suspended slab 5.20 metres high from the ground using a proprietary formwork system, eliminating the need for erecting catch decks for safety purposes in comparison to using conventional formwork. Concrete pours were administered into two separate areas and were conducted out of hours to minimise disruption to commuters.

Scope of Works

Complex Building Structure

  • Concrete freestanding columns and walls
  • Construction of a two-level lift shaft
  • Ground level slab
  • First floor level suspended slab
  • Mezzanine level slab
  • Upstand walls
  • Stair shaft walls
  • Cast in-situ stairs × 3
  • Pavements
  • All concrete quality as per RMS QA specification B80
Project Facts
Client
Degnan Constructions
Sector
Building
Location
Burrows Road, Sydney NSW
Status
Completed
Duration
June 2019 – October 2019
Program
WestConnex
Package
FRP
Suspended slab
3,000 m² at 5.20 m
Specification
RMS QA B80